Coming soon. The full video library is being recorded. In the meantime, the documentation covers every workflow step-by-step, and the free tier lets you walk through a real project today.
Series 1 — Getting started
- 01 · Project setup (3 min) — Pick your standard (NEC 2023 / CEC 2024), units, and jurisdiction. How the rule-pack lock works.
- 02 · Adding panels & loads (5 min) — Tag loads to panels, balance phases, see live demand update.
- 03 · First load calculation (4 min) — Run the engine, read TraceStep, expand a rule citation.
- 04 · Sizing your service (3 min) — Auto OCP selection per Rule 14-104 / Article 240.6, terminal-temp column logic.
- 05 · Your first PDF report (4 min) — Generate RPT-001, review sections, attach P.E. seal.
Series 2 — Calculation deep-dives
- Voltage drop with corrected R — Why EEP uses temperature-corrected resistance instead of book-rated.
- Motor branches end-to-end — From FLA table lookup through OCP, overload, disconnect, conduit fill.
- Tenant fit-out scoping — How
project_type = TENANT_FITchanges the demand calculation. - Healthcare EES separation — Tagging loads to Life Safety / Critical / Equipment branches.
- Generator sizing with motor starting — Inrush kVA, voltage dip, and NFPA 110 levels.
Series 3 — Reports & SLD
- RPT-001 walkthrough — Section-by-section, what each table comes from, how to read the citations.
- SLD generation — From engine state to one-line drawing, no separate drafting step.
- Compliance summary — Reading the warnings panel, resolving each item, documenting overrides.
- Audit log & TraceStep export — Hand-off to plan review with full traceability.
Series 4 — Team workflows
- Sharing a project — Role-based access, viewer vs editor vs owner.
- Org & team setup — Multi-firm structure, standard inheritance, default jurisdictions.
- Plan review hand-off — PDF + audit log + change history, all in one package.